165 Shear & butt welder system - 165 Shear & butt welder system - Exportimes
Products List
Company Profile

165 Shear & butt welder system

FOB Reference Price / Min.Order Quantity : Get Latest Prices
Processing Time: 1 Days - 60 Days
Packaging Details: STANDARD EXPORTING PACKAGE

Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other

Payment Terms: L/C , T/T , other

Share to:

Basic Information

Brief description

Quick Details

  • Type: Pipe Welding Machine
  • Pipe Material: Carbon Steel
  • Application: shear and butt welder
  • Place of Origin: Liaoning, China (Mainland)
  • Brand Name: CONTOR
  • Model Number: 165
  • Features: simple structure, reliable working performance,precise running.,etc
  • Functions: ensure the continuous production on the welded pipe production line

Detailed description



Packaging & Delivery

Packaging Details: seaworthy package
Delivery Detail: about 120-180days

Specifications

simple structure, reliable working performance
continent operation,precise running
ensure continuous production on pipe line

A. Description of Shear& Butt Welder System

The shear welder machine is necessary to increase production and improve products quality. Controlled by microcomputer and driven by hydraulic system to weld metal sheet automatically by CO2 gas and got a spiral welding seam. Compared with other productions at home and abroad, our equipment has a simple structure, reliable working performance, continent operation and precise running, which can ensure the continuous production on the welded pipe production line.

 

B. Working principle

1. Cut off the trailing edge of the strip steel

     After filling materials to the accumulator, the trailing edge of the strip steel is sent to the cutting system. Align mechanism clamps strip steel, pinch roller fall to tighten, then the blade and pressure reducing plate drop down, and finish cutting of the trailing edge of the strip steel.

2. Form welding seam

     After cutting of the strip steel trailing edge, keep the trailing edge on a clamped and impacted state. The car moves right some distance, and at this time, the cylinder withstands welding seam adjusting gasket. The car returns to left and tightens welding seam adjusting gasket to form welding seam. The size of welding seam is the size of adjusting gasket difference.

3. After uncoiling and flattening, the leading edge of strip steel enters to front align mechanism of the shear welder and moves forward to shear and cut system. At this time, clamp the front align splint, and then the front align mechanism cylinder drives the splint to align the leading edge and the trailing edge of the foregoing strip. After alignment, blade drops down and finishes the cutting of strip steel leading edge.

4. Welding

After cutting off the leading edge of strip steel, the car moves right to the lathe bed right baffle and at this time the welding seam is now at the middle of two binder plates. Let the two binder plates tighten the leading edge and trailing edge of the strip steel, adjust welding gun position, and start welding. For the electric signal feedback, the welding gun voluntarily stops when it moves all bandwidth. One welding seam is finished welding. Then the system releases, all the state back to the home position and wait for the next working cycle. Driven by accumulator, rapidly fill materials, and finish the whole shearing and welding process. Repetitive running is as the above process.

 

Shenyang Contor Machine & Electric Equipment Co., Ltd., subjected to Shenyang Ligong University, was originally named as Shenyang Machine & Electric Equipment Development Corporation by Shenyang Institute of Technology.

We are mainly engaged in the manufacture, development and sale of digital motion controllers and processing equipment, such as spiral accumulators, shear welders, flying cutoff machines flying shear machines, and welded pipe production line equipment. We also develop new systems for users.

Our major products - FJ computer-controlled flying saws have been appointed as "New Products" by State Bureau of Technical Supervision, and listed in "National Torch Plan". Taking "credit, service and technology" as our tenet, our company becomes the supporter of National Key Technological Achievement Extension Plan, and integrates the manufacture and research.

Our company constantly develops hi-tech products. To meet users' requirements, we firstly adopted overseas digital driving system to substitute simulating system in 2000. CD-A computer, compatible with FJ-B of the original Shenyang Institute of Technology, was produced in 2001.

In 2002, high precision (0.5mm) and speed (no more than 120m/min) standard servo flying saw was produced and applied to lamp tube lines. Rotary flying saw was developed in the same year.

In June 2003, DC saw was replaced by AC flying saw, which has already gained the patent (Patent No. 03238131.X).

In March 2003, NC research team was set up supported by the institute.

In April 2004, 32-bit CT-01 digital controller was promoted to satisfy users. In June, the absolute synchronized saw was launched. Till now, we have developed large-caliber saws and high-precision/speed board horizontal and punching shears.

Now, we can provide complete welded pipe production lines, stainless steel pipe flying saws, and deformed steel bar production lines, according to customers' requests. We are also specialized in manufacturing online cutting and shearing machines, such as welded pipe flying cutoff machines, stainless steel pipe flying cutoff machines, steel plate flying shear machines, and deformed steel bar flying shear machines, with good effect and high precision cutting.

At present, our main products such as welded pipe equipment and cutting and shearing machines have been selling well all over the world, including Indonesia, Thailand, India, Russia, Syria, and other countries and regions.

Basic Information

  • Business Type:
  • Main Products:
  • Location:
  • Total Employees:
  • Year Established:

Trade Information

  • Top 3 Markets:
  • Accepted Payment Currency:
  • Nearest Port:
  • Average Lead Time:
  • Overseas Office:
    No

Company Pictures

165 Shear & butt welder system

Post Buying Request

  • * Requirement:
  •   Expected Order Quantity:
  •   Add your product parameter requirements
  • Please input your product parameter requirements
  • * Detail:Please input detail
  • Your detail must be between 20-8000 characters
  •   Attach File(s)Maximum File Size: 5MB
    Add the files you want to send.
    Upload the files you have added.

  •   Name:
  • * Country:
  •   Company Name:
  • * Your Email Address:The email format you entered is incorrect.
  • Your email is also your login ID
  •   Other Contact Information:
  • Send Message

Supplier Details

Shenyang Contor Machine & Electric Equipment Co.

Year Established:

Business Type:

Management Certifiation:

Operational Address:

Other Related Products

The heating ceramic zinc pot
China Dongfang Manufacturer Easy Operation Aquatic Plants Cutting Boat
(100% original) Omron Sensor E3Z-R61
Siemens SWITCH sensor VDE0660
Low-voltage Mitsubishi Solid State Contactors US-N20TE
NEW ORIGINAL MADE IN JAPAN TRD-J360-RZ

Browsing History

ICP许可证号:辽B2-20160268. Business License. Copyright Notice © 2018-2023 Liaoning MEC Group Co., Ltd. All rights reserved.辽ICP备09008998号-11