3mm APP modified bitumen membrane - Exportimes.com

Supplier Details

Liaoyang, Liaoning Hongye Chemical Co., Ltd.  

Year Established:

Business Type:Manufacturer

Management Certifiation:

Operational Address:
Liaoning, China (Mainland)

More from this Supplier

3mm APP modified bitumen membrane

3mm APP modified bitumen membrane
  • 3mm APP modified bitumen membrane
Share to:

1.Good waterproofing

2.Ageing-resistance function

3.No pollution, and long service life,

Product Details

Description

Product Features:

The products are made by soaking the base thermoplastics (such as a tactic polypropylene-APP,APAO.APAL) modified bitumen, then covering double faces with elastomeric (SBS)or thermoplastics (APP,APAO,APAL)modified bitumen, and last finishing the upward face with fine sands, mineral slates or polythene membrane etc. While downward face with fine sands or polythene membrane, It has good waterproofing and ageing-resistance function, not flowing at highest temperature and no crack at lowest temperature; easy application, no pollution, and long service life, etc .APP modified bitumen waterproof membrane is specially suitable to the building waterproofing in cold area and to the buildings of changeable constructions, while APP specially suitable to high temperature and strong sun-shining.

Characteristic

It has good waterproofing and ageing-resistance function, not flowing at highest temperature and no crack at lowest temperature; no pollution, and long service life, etc. SBS modified bitumen waterproof membrane is specially suitable to the building waterproofing in cold area and to the buildings of changeable constructions, while APP specially suitable to high temperature and of atrong sun-shining.

Applicable scope

1>Make sure the roof deck smooth, and dry (moisture<9%), then apply the surface oroof deck homogeneously with a kind bitumen paint, till dry to start application.

There are two methods in application:

a./One way is by heating and melting method. Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted (not flowing), then install the membrane filly bonded to the roof deck with overlaps of 5-10cm.
b. /The other way is by cold adhesive method. Pour the cold adhesive homogeneously on the roof deck, then roll the membrane to install it to be fully slicked to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in application as requested.

2.after application, a full serious inspection is required to sure no air bubble, no falling away, etc. to guarantee the waterproof life

Company Profile

Hongye Chemical Co., Ltd. Liaoyang, Liaoning established in March 2003 with a registered capital of 2 million working capital 4,000,000. To produce a limited liability type and trade marketing operations. Business: chemicals, chemical fiber, metal, equipment, machinery, building materials. Corporate representatives Wang Zhongtang headed the board of directors, under the Office Manager, Production Department, Finance Department, Marketing Department, Technical Services Division (site inspection chamber). Existing staff of 60 people, the "respect for others, justice of others, sincere man" as a principle of life. Corporate culture philosophy: "people-oriented, real dedication to the new promotion, to the letter to survive." The company aims: "credibility first, quality first, service first."
 Liaoyang, Liaoning Hongye Chemical Co., Ltd.

Post Buying Request

  • * Title:Please input title
  • * Message:Please input message
  • Your message must be between 20-8000 characters
  • * Your Email Address:Please input Email
  • Your email is also your login ID

You May Be Interested In

辽ICP备09008998号-11 ICP许可证号:辽B-2-4-20110169. Copyright Notice © 2016-2021 Liaoning MEC Group Co., Ltd. All rights reserved.