Specifications
1.8 years experience
2.Credible quality
3.Delivery in time
4.Long life time
5.Ensured performance
Product introduction:
Introduction of foreign advanced technology, it hardens quickly,water stop instantly.The solidification time can be controlled and the rapid solidification style can be used with water.The delayed solidification is not onlya waterproof with good property,but also have perfect property in the adhesive material.
Characteristic:
1,Short solidification time,increasing strength rapidly,permanent fastness.
2,Perfect water stop strength,good impermeability and property of water pressure resistance
3,Nice adaptability,can be bonded closely with concrete,mortar,brick and stone ect.
4,Strong adhesive strength,can be synchronisinged on waterproof and adhesive and finished in one time
5,No corrosivity to steel construction,no need to maintenance to finished project.
Tech.Data:
NO.
|
Items
|
Delay solidification
|
Rapid solidification
|
I
|
II
|
1
|
Setting time
|
Initial set,min
|
≥10
|
≥2~<10
|
Final set,min ≤
|
360
|
15
|
2
|
Compression strength ,Mpa
|
1h ≥
|
—
|
4.5
|
3d ≥
|
13.0
|
15.0
|
3
|
Breaking strength,Mpa
|
1h ≥
|
—
|
1.5
|
3d ≥
|
3.0
|
4.0
|
4
|
Impermeability pressure difference,Mpa 7d ≥
|
Coating
|
0.4
|
—
|
Impermeability pressure, Mpa 7d ≥
|
Test specimen
|
1.5
|
1.5
|
5
|
Adhesive strength, Mpa 7d ≥
|
1.4
|
1.2
|
6
|
Heat resistance,100°C,5h
|
No cracking,peeling and dropping
|
7
|
Freeze-thaw cycle(-15°C,~+20°C,)20 times
|
No cracking,peeling and dropping
|
Application:
1. All kinds of underground building,channel,pool,kitchen and washroom ect.
2. Rapid solidification is used for plugging rapidly in egress of water of concrete
3. Delayed solidification is used for the moistureproof treatment in capillary water seepage and without water seepage.
4. Can be pasted on variety of tapestry brick and board ect,playing a good part in water proof.
Processing:
Leaking(rapid solidification)
1. Base:Chisel a groove 30-40mm depth along the point or line of percolating water.
2. Burdening: material:water=1:0.25,kneading to pallet shape rapidly after mixing.(Using warm water based on temperature below 10°C)
3. Operation:According to the size of hole and groove,pinch the material into this shape whose size is smaller than hole and groove.After it becomes hot and hard,pack the material into the hole and groove rapidly and squeezing and tamp lightly with wooden bar to make sure all the material is full of the hole and groove.At last,spread coating on the surface of material.
Delayed solidification waterproof layer
1. Firstly,daubing one layer of material with trowel or scraper blade.Secondly,after the firstly layer becomes hard,then spurt water on it,at last daub the second player of material.
2. Daubing the material strongly and wipe it back and forth to make sure the coating becomes air free.Then maintenance for 2-3 days after drying
3. If the point or line of percolating water is happened,plug it with rapid solidification or then treat the point or line of percolating water,the way is same as above.
Storage:
Storied in ventilated,dry and cool place,shelf life: 6 months
Packing:25kg/carton
About us:
8 years experience
Self-research and development, professional, innovation-oriented company
The most specialized products and technology
Professional products and technical system and perfect service system
"Innovation, profession, loyalty, happyness" is our team theme
Beijing Longwei Times Science & Technology Co., Ltd. will continue to exploit years of professional advantages to the full, provide customers high quality, high value products and technical services.
Choose us, choose your best partner!