Specification:
Raw material: Slag waste; Waste ceramics
Sizes:
300mm*300mm*55mm
300mm*150mm*55mm
200mm*200mm*55mm
200mm*100mm*55mm
200mm*400mm*55mm
Color:
We have all kinds of colors, like red, yellow, brown, gray, chestnut, maroon, khaka, black etc.
Advantages
1). Water permeability
Super high permeability function, more than 20mm/s which is two times of the standards of similar foreign products. It can handle 60mm/s rainfall. The road and squares paved with it can make rainwater quickly penetrate down to prevent the occurrence of city flood.
2). Water retention
It can be used to reduce the temperature of the environment, restore natural water storage capacity, prevent the depletion of groundwater, and improve the living environment of vegetation.
3). Skid Resistance
Rainwater infiltrates into the ground timely. There is no water. Keep the ground clean. Walking on it brings no danger. Used in public or family kitchen and bathroom floor, it exerts excellent anti-skid effect.
4). Noise Reduction
Porous structure can absorb the vehicle noise, and create a quiet and comfortable environment. It have been widely used in foreign countries in airports, subway and other places.
5). Repeated use
Because of the characteristics of product in the design, it can be used repeatedly, reducing waste in construction of city and the waste of various resources, and produce good economic benefit and social benefit.
6). Compression-resistant, Cold-resistant, weathering-resistant
Made by large tonnage press and high temperature firing. The compressive strength is ≥ 50MPa, suitable for use in the parking lots, common lanes. Its frost resistance value is -25? C.
7). Low carbon emission and environmental protection
Long product life and weathering resistance can bring infinite times repeated recycling.
Application
1). Plaza
2). Residential sidewalk
3). Ground in the cities which are short of water
4). Square sidewalk
5). Port
6). Ground bricks for kitchen, toilet and school
7). Household bathroom shower
8). Park, ecological garden, pool and pond
9). Patio of Villa and building rooftop
10). High way and urban road side
Construction steps
1) Groundwork processing
2) Pavement procedure of crushed stones
3) Pavement procedure of sand
4) Pavement procedure of tile
5) Level criterion
6) Pavement procedure of joints
7) Leveling down
8) Edge processing

